# Performance Improvement Plans (PIPs): A Detailed EM Playbook

Source: https://www.techinterview.org/post/3233475348/performance-improvement-plans-pips-em-playbook/
Updated: 2026-07-12 · techinterview.org

The PIP (performance improvement plan) is one of the most consequential and most-mishandled tools an engineering manager has. Done well, it gives a struggling engineer a real chance to recover or a clean exit; done poorly, it becomes a paper-shuffle that everyone resents. This guide is a detailed playbook for the EM facing the question.

## When a PIP is the right tool

A PIP is appropriate when:

- The engineer is meaningfully below the bar for their level on observable, defined criteria

- You have already had multiple direct conversations with documentation

- The performance problem is a sustained pattern, not a single incident

- The engineer has had reasonable time and support to demonstrate change

- You and HR agree this is the right next step

## When a PIP is the wrong tool

- Performance gap caused by your management failure (unclear expectations, no feedback)

- Recent personal-life disruption with no time to recover

- Mismatch problem where the role or team was wrong from the start

- Discrimination concern: protected-class status correlates with the PIP decision

- The engineer has not been told the problem is severe yet

If any of these apply, address them first. PIPs administered without prior clear feedback are professional malpractice.

## Pre-PIP conversations

Before the formal PIP, the engineer should have heard:

- What the gap is, in concrete behavioral terms

- Why it matters (impact on team, customers, or product)

- What you need to see change

- What support you will provide

- That continued failure to improve will lead to formal action

This is documented in your 1:1 notes. If you cannot point to two prior conversations like this, you are not yet at PIP stage.

## Writing the PIP

The PIP document should include:

- Specific behaviors that need to change, in observable terms

- Concrete success criteria for each — what does "good" look like?

- Timeline (typically 30–90 days; longer for technical-skill recovery)

- Check-in cadence (usually weekly with you, biweekly with HR)

- Resources and support being provided

- Outcomes: what happens if the bar is met or missed

Avoid vague phrases like "improve communication." Concrete: "Send written status update by EOD Tuesday on each project; respond to teammates' tags within 24 hours during business days."

## The PIP conversation

- Schedule with HR present

- Lead with the facts: what you have observed, why it falls short, what has not improved

- Walk through the document together

- Make sure the engineer understands the stakes

- Acknowledge the difficulty; do not perform compassion

- Give them time to ask questions

- Do not negotiate the bar

## During the PIP

- Weekly 1:1 focuses heavily on PIP progress

- Document each meeting in writing immediately after

- If they hit a milestone, name it explicitly

- If they miss, name that explicitly too; no surprises at the end

- Adjust scope if your initial criteria turn out to be unfair (rare; document the adjustment)

- Do not promise outcomes you cannot deliver

## Possible outcomes

- A successful PIP means the engineer met the bar; the PIP closes and you continue with normal management

- A partial outcome is when the engineer made real progress but did not fully clear the bar; sometimes a second PIP cycle, sometimes a clean exit with severance

- A failed PIP means the engineer did not improve; they exit the company, usually with severance per company policy

- A voluntary exit is when the engineer chooses to leave during the PIP; treat it as a resignation

Roughly 30–40% of PIPs end in successful completion at most companies; 60–70% end in exit. Numbers vary widely by org.

## The team-impact dimension

- Other engineers usually know something is wrong; they do not know the details

- You cannot share PIP status, but you can manage the team's perception of fairness

- If the engineer exits, do not gossip; be brief and professional ("X has decided to leave; we wish them well")

- Teammates who covered for the struggling engineer deserve recognition; surface their work

## Common EM failure modes

- Issuing PIPs without sufficient prior feedback, so the engineer is genuinely surprised

- Using PIPs to avoid difficult conversations earlier (PIPs should be the last step, not the first)

- Vague success criteria that cannot be objectively evaluated

- Inconsistent enforcement: one engineer PIPed for behavior another tolerated

- Treating PIPs as paper exercises with predetermined outcomes

- Failing to coordinate with HR, since process violations create legal risk

## If you are reading this because you are on a PIP

Treat it seriously, work it in good faith, but also start a job search. Even successfully completed PIPs sometimes leave a residual mark. Your decision to leave on your own terms remains available throughout.

## What separates senior EMs from staff/director

Senior EMs run good PIPs. Staff/director EMs prevent most PIPs by giving consistent feedback earlier, by hiring with greater rigor, and by addressing role-fit mismatches before they become performance issues. Avoiding the PIP is the higher-leverage skill.

## Frequently Asked Questions

### How long should a PIP be?

30 days for behavioral or velocity issues; 60–90 days for technical-skill development. Shorter than 30 is rarely fair; longer than 90 is unusual.

### Can I PIP someone for cultural fit?

"Cultural fit" is too vague to justify a PIP. Identify the specific behaviors and document those. If you cannot point to behaviors, the issue is yours to work out, not the engineer's.

### Should I tell the rest of the team someone is on a PIP?

No. PIP status is confidential between you, HR, and the engineer.
